Schedule of Fees
| CATEGORY OF DEVELOPMENT | FEE PAYABLE |
|---|---|
| 5. Plant and machinery (including alterations
and replacement) [Cranes, hoppers, conveyor belts, radio masts ] . |
- where site area does not exceed 5 hectares, £335 for each 0.1 hectare of the site - where site exceeds
5 hectare £16,565, and an additional £100
for each 0.1 hectares in excess of 5 hectares (Maximum
Fee £250,000) |
| 6. Playing fields (ancillary works except new
buildings). Non profit making clubs etc. for the purpose of a single undertaking (incidental to the |
£335 |
| 7. Car parks, service roads and other means
of access on land used existing use of the land) |
£170 |
| 8. Winning and working of minerals |
- where the site area does not exceed 15 hectares, £170 for each 0.1 hectares of the site area; - where the site area exceeds 15 hectares, £25,315, and an additional £100 for each 0.1 hectares (Maximum Fee £65,000) |
| 9. The carrying out of any operations connected with exploratory drilling for oil or natural gas |
- where site area does not exceed 7.5 hectares, £335 for each 0.1 hectares of the site area; - where site area exceeds 7.5 hectares, £25,000, and an additional £100 for each 0.1 hectares in excess of 7.5 hectares (Maximum Fee £250,000) |
| 10. The carrying out of any operations not coming within any of the above categories | £170 per 0.1 hectare (Maximum Fee £250,000) |
| 11. Change of use (Other than in Category 3) | £335 |
| 12. Renewals (A flat rate fee is payable) | Please enquire |


